Powering what's next.

Smartland Energy develops dedicated, behind-the-meter power for the industries driving America's next generation of growth.

Reserve Dedicated Power

Decentralized Power, Built At The Load

Smartland Energy develops decentralized power infrastructure: dedicated generation on the customer's side of the meter, sited at the load it serves, for AI factories and GPU campuses, cloud and large-scale data centers, robotics factories, heavy industry and advanced manufacturing, the defense industry, and other mission-critical operations. Our projects deliver power independent of centralized grid buildout. Depending on customer requirements, generation can be configured using modular reciprocating engines or high-efficiency combined-cycle technology, with future CHP integration available where beneficial.

We are backed by Smartland, an established private equity platform, and led by an experienced team. We integrate the components most developers split: capital, generation technology, gas supply, permitting, land acquisition, and regulatory strategy. Our team has decades of experience building and commissioning more than 10 GW of gas and renewable capacity globally.

Smartland Power: central generation site delivering dedicated behind-the-meter power to data center, heavy manufacturing, defense manufacturing, commercial, agricultural, and logistics and distribution offtakers

10+ GW

Built and commissioned by our team globally: West Offaly, Lough Ree, GNPower Dinginin

Q1 2028

Earliest first power, one of three delivery timelines

400 MW

Maximum per campus for liquid-cooled, high-density compute

N+2

Reliability architecture, A/B power at the POD

Dedicated behind-the-meter (BTM) capacity under contract-backed SLAs, structured for procurement, lender, and investor diligence.

Three Delivery Timelines. You Choose the Date.

Projects are offered on three delivery timelines. Each one delivers the full contracted capacity for the full contract term; what changes is the date and the price. The earlier the date, the higher the price.

Fastest Q1 2028

First power, full contracted capacity

Price
Highest

When the date matters most.

Balanced Q1 2030

First power, full contracted capacity

Price
Mid-range

When date and price both matter.

Lowest cost Late 2031

First power, full contracted capacity

Price
Lowest

When the price matters most.

Dates are indicative and assume a capacity commitment in Q1 2027; a later commitment moves each date. The timeline, price and terms are set out at term sheet and become binding only in the signed contract. How to secure your date →

Three Verticals, One Outcome

We design, finance, build, and operate dedicated power for three verticals where grid-only supply is a liability:

For AI & Cloud

AI factories, GPU training campuses, and cloud infrastructure, with A/B power at the POD and a contract-backed SLA written for procurement and finance diligence.

Learn More →

For Industrial

Robotics and automation factories, advanced manufacturing, food processing: production uptime, ramp behavior, optional CHP, transparent metering at the POD.

Learn More →

For Defense

Installation resilience, island-mode capability, cyber-isolated controls, EUL/PPA/ESPC/UESC/ERCIP-ready structuring.

Learn More →

Team Projects

Plants our team built and commissioned before Smartland Energy, part of a 10+ GW track record.

A Straight-Talking Neighbor

Every host community asks us the same nine questions, about property values, noise, air, water, and the grid. Here are our answers, in plain language, with real examples you can verify yourself.

Read our Community Commitments →