Fastest Q1 2028
First power, full contracted capacity
- Price
- Highest
When the date matters most.
Smartland Energy develops dedicated, behind-the-meter power for the industries driving America's next generation of growth.
Reserve Dedicated PowerSmartland Energy develops decentralized power infrastructure: dedicated generation on the customer's side of the meter, sited at the load it serves, for AI factories and GPU campuses, cloud and large-scale data centers, robotics factories, heavy industry and advanced manufacturing, the defense industry, and other mission-critical operations. Our projects deliver power independent of centralized grid buildout. Depending on customer requirements, generation can be configured using modular reciprocating engines or high-efficiency combined-cycle technology, with future CHP integration available where beneficial.
We are backed by Smartland, an established private equity platform, and led by an experienced team. We integrate the components most developers split: capital, generation technology, gas supply, permitting, land acquisition, and regulatory strategy. Our team has decades of experience building and commissioning more than 10 GW of gas and renewable capacity globally.

10+ GW
Built and commissioned by our team globally: West Offaly, Lough Ree, GNPower Dinginin
Q1 2028
Earliest first power, one of three delivery timelines
400 MW
Maximum per campus for liquid-cooled, high-density compute
N+2
Reliability architecture, A/B power at the POD
Dedicated behind-the-meter (BTM) capacity under contract-backed SLAs, structured for procurement, lender, and investor diligence.
Projects are offered on three delivery timelines. Each one delivers the full contracted capacity for the full contract term; what changes is the date and the price. The earlier the date, the higher the price.
First power, full contracted capacity
When the date matters most.
First power, full contracted capacity
When date and price both matter.
First power, full contracted capacity
When the price matters most.
Dates are indicative and assume a capacity commitment in Q1 2027; a later commitment moves each date. The timeline, price and terms are set out at term sheet and become binding only in the signed contract. How to secure your date →
We design, finance, build, and operate dedicated power for three verticals where grid-only supply is a liability:
AI factories, GPU training campuses, and cloud infrastructure, with A/B power at the POD and a contract-backed SLA written for procurement and finance diligence.
Learn More →Robotics and automation factories, advanced manufacturing, food processing: production uptime, ramp behavior, optional CHP, transparent metering at the POD.
Learn More →Installation resilience, island-mode capability, cyber-isolated controls, EUL/PPA/ESPC/UESC/ERCIP-ready structuring.
Learn More →Plants our team built and commissioned before Smartland Energy, part of a 10+ GW track record.



Every host community asks us the same nine questions, about property values, noise, air, water, and the grid. Here are our answers, in plain language, with real examples you can verify yourself.
Read our Community Commitments →