Current Initiatives

Active U.S. development pipeline.

Smartland is actively developing dedicated Private Grid power infrastructure across the United States, focused on geographies where utility constraints, demand growth, and policy environment favor decentralized generation built at the load. Buyers evaluating a Smartland offtake should expect us to discuss the projects below candidly: what stage they're at, what the schedule drivers are, and where there is or isn't capacity available.

Active Efforts

  • Technical and financial evaluation of legacy coal and hydroelectric plants for Private Grid repurposing
  • Strategic site targeting for flexible, dispatchable generation assets to serve data center and industrial load
  • Competitive redevelopment bids across active U.S. development geographies
  • Stakeholder and regulatory engagement to align project siting with regional economic development priorities
  • Partner-driven hybrid system modeling integrating gas, layered solar and storage, and forward-looking firm-power technologies (advanced nuclear, hydrogen)

The Path to First Power

Dedicated power is built in stages. Here is the development lifecycle and where the pipeline sits today, so a buyer evaluating an offtake, and the lender's technical advisor reviewing it, know exactly what has to happen, and when, between now and power online.

1

Development & Site Evaluation (active now)

Site identification, technical and financial evaluation, competitive redevelopment bids, and stakeholder/regulatory engagement across Ohio, Virginia, Minnesota, and adjacent regions.

2

Site Control & Permitting (active now at our lead site)

Securing site rights and advancing the permitting and interconnect scope for a selected site, with land acquisition led in-house.

3

Notice to Proceed (NTP)

Capacity reserved and contracted, financing closed and equipment ordered; the build clock starts at NTP.

4

Construction & Commissioning

Generation installed and commissioned; MV distribution and controls built out and validated.

5

First Power (as early as Q1 2028)

First customer load energized under a contract-backed SLA with defined outage classifications and remedies, on the delivery timeline the customer chose: Q1 2028, Q1 2030 or late 2031. Additional capacity is added as contracted load grows.

Where Our Lead Site Stands: Van Wert County, Ohio

A 150 MW Private Grid gas plant, built N+2. Stage: site control and permitting.

Land
Secured: about 155 acres under option.
Gas supply
Confirmed: supply for about 150 MW, in writing, from the local gas utility.
Environmental
Complete: Phase I Environmental Site Assessment clean, March 2026.
Local approvals
In progress: land-use approvals expected by January 2027.
Air permit
In progress: Ohio EPA pre-application complete, in an air-quality attainment county.
Water
Designed: closed-loop cooling.
Grid connection
Optional: the plant is designed to run as an island, independent of the grid.

Featured Initiatives

Active Geographies

We are currently most active in:

  • Ohio: 150 MW lead site in development in Van Wert County; Muskingum River redevelopment bid; multiple additional site evaluations across central and eastern Ohio; engagement with state-level energy stakeholders (Ohio Energy Symposium); meetings with Ohio policy leaders on the future of Private Grid generation
  • Minnesota: Brainerd Hydroelectric clean-repurposing evaluation
  • Virginia: site evaluation activity in Tazewell County
  • West Virginia and adjacent Appalachian regions: energy community siting evaluation
  • Additional geographies under evaluation; details available under NDA