Request Capacity Availability
Tell us your MW need, schedule, and constraint. We respond within 1 business day.
Smartland Energy's initial capacity is targeting power online in Q3 2028, approximately 24 months after Notice to Proceed. Capacity is delivered as decentralized, behind-the-metergeneration built at your load: modular 10 MW RICE units or combined-cycle gas turbine plants, sized to your actual load shape. Per-site capacity ranges from 100 to 300 MW for traditional air-cooled deployments and up to 400 MW per site for liquid-cooled high-density data centers. CHP available where beneficial. Segmented MV distribution, UPS-backed controls, and black-start capability. Contract-backed SLA at the POD.
This form goes directly to our development team, not a marketing queue. If your inputs match an active site (current evaluations include Ohio, Virginia, and Minnesota), we will respond with a fit assessment, a draft schedule alignment, and the specific diligence items we need from you to move toward a term sheet.
Your Request
What Happens After You Submit
- Within 1 business day: Our development team reviews your inputs against our active pipeline and confirms whether Smartland is a fit for your MW, schedule, and constraint. If grid power on your timeline is the better answer, we will say so.
- Within 5 business days: If fit is confirmed, we schedule a 30-minute scoping call to align on POD boundary expectations, architecture (RICE vs. CCGT), and the next set of information we need.
- Within 30 days of scoping: If both parties want to proceed, we issue a term sheet and capacity reservation framework.
Initial capacity targeted for Q3 2028 is finite. Submitting this form starts the review outlined above; it creates no obligation on your side.