Dedicated behind-the-meter power for data centers and large loads.

Reserve capacity in a Phase 1 100–300 MW combined-cycle natural gas project.

Target power online in ~24 months (subject to permitting).

Tell us your MW need and target go-live window. We’ll respond within 1 business day.

"*" indicates required fields

Built for mission-critical operations

Target Reliability

Firm delivery design with N+2 redundancy, POD A and B demarcation, segmented MV electrical architecture, UPS backed controls, and black start.

Optional CHP Integration

CHP integration can be added to convert waste heat into usable thermal energy for adjacent facilities and campus loads.

Optional Cyber Isolated Control Systems

Optional cyber isolated control architecture to segregate plant controls from customer networks with hardened remote access and monitoring.

Proof, not vibes

Leadership team with experience commissioning 10+ GW across large-scale power assets.

Why Teams Choose Smartland Energy

What You Get
How It Helps You
1
1 What You Get

Fast start and load following generation

How It Helps You

Handles volatile AI and HPC ramps without forcing you to oversize utility capacity

2
2 What You Get

Transparent metering and settlement at the POD

How It Helps You

Clean billing, clean audits, and less time arguing about what was delivered

3
3 What You Get

Fuel price risk options

How It Helps You

Lets you choose indexed, capped, or hedged structures that match your risk tolerance

4
4 What You Get

Modular build approach

How It Helps You

Add capacity in blocks without redesigning the entire plant or stranding early capex

5
5 What You Get

Permitting and compliance execution plan

How It Helps You

Reduces schedule surprises and keeps operations aligned with emissions and reporting requirements

6
6 What You Get

Bankable contracting structure with clear remedies

How It Helps You

Turns "reliability talk" into enforceable SLA terms that your procurement team can underwrite

Core Principle

Power Generation Must Equal Demand

We build capacity sized precisely to your load and bring it online when you need it.

Generation
=
Demand
Power generation infrastructure
Next steps illustration

Get Started

Next Steps

01

Reserve capacity

Tell us your expected MW draw and go-live date.

02

Align technical specs

Our engineers map interconnect, heat recovery, and security requirements.

03

Execute PPA

Lock in long-term, cost-predictable power.

If you need dedicated megawatts on a defined timeline, request capacity availability.

You’ll get a clear answer on fit, next steps, and what information we need to propose terms.