The path from first call to energized load - and what has to happen at each step.

Work Backward From Your Go-Live Date

A 2028 go-live leaves no room for a multi-year interconnection queue. Dedicated Private Grid capacity is decentralized generation built at your load, on a clock the project controls. That means a choice of three delivery timelines, with first power as early as Q1 2028.

Those dates only hold if the commercial steps happen early. Here is the whole path, in order - the same sequence your procurement team and lender's technical advisor will walk through.

Q1 2028

Earliest first power: one of three delivery timelines, reserved in sequence

100-400 MW

Air-cooled to liquid-cooled, high-density deployments

Three Delivery Timelines. You Choose the Date.

Projects are offered on three delivery timelines. Each one delivers the full contracted capacity for the full contract term; what changes is the date and the price. The earlier the date, the higher the price.

Fastest Q1 2028

First power, full contracted capacity

Price
Highest

When the date matters most.

Balanced Q1 2030

First power, full contracted capacity

Price
Mid-range

When date and price both matter.

Lowest cost Late 2031

First power, full contracted capacity

Price
Lowest

When the price matters most.

Dates are indicative and assume a capacity commitment in Q1 2027; a later commitment moves each date. The timeline, price and terms are set out at term sheet and become binding only in the signed contract.

The Path, Step by Step

1

A 15-Minute Scoping Call

Your load profile, density roadmap, redundancy requirements, and target dates. We tell you plainly whether we can serve it - and when. If grid power is still the right call for your situation, we say so.

2

Capacity Availability Request

A formal response on available MW by timeline, at a defined Point of Delivery. Request availability →

3

Reservation and Contracting

Capacity reserved under contract terms written for procurement, lender, and investor diligence: defined outage classifications, remedies, revenue-grade metering, and milestone-backed credit support.

4

Notice to Proceed

Financing closes, equipment is ordered and the clock starts. From NTP, schedule is driven by the timeline you chose, permitting, and site-specific scope.

5

Build on Your Timeline

Generation installed and commissioned for first power in Q1 2028, Q1 2030 or late 2031, as you chose; segmented MV distribution; A/B delivery at the POD; UPS-backed controls and black-start capability. Executed by a team with a 10+ GW track record.

6

Energization Under SLA

Load comes online under a contract-backed SLA - not marketing uptime. Capacity scales with your load.

What We Need From You

The scoping conversation moves fastest when you bring three things: an anticipated load range (even rough), a density roadmap (air-cooled today, liquid-cooled later is a common answer), and the date your load must be live. Site preferences help but are not required - we evaluate sites against your requirements, not the other way around.

Compare this path against the interconnection queue →

Why Order Matters

Delivery slots are finite and reserved in sequence. The earliest dates assume a capacity commitment in Q1 2027; the same conversation a year later is a conversation about later dates. That is not a sales device: it is how equipment queues and project-financed generation work.