Fastest Q1 2028
First power, full contracted capacity
- Price
- Highest
When the date matters most.
The path from first call to energized load - and what has to happen at each step.
A 2028 go-live leaves no room for a multi-year interconnection queue. Dedicated Private Grid capacity is decentralized generation built at your load, on a clock the project controls. That means a choice of three delivery timelines, with first power as early as Q1 2028.
Those dates only hold if the commercial steps happen early. Here is the whole path, in order - the same sequence your procurement team and lender's technical advisor will walk through.
Q1 2028
Earliest first power: one of three delivery timelines, reserved in sequence
100-400 MW
Air-cooled to liquid-cooled, high-density deployments
Projects are offered on three delivery timelines. Each one delivers the full contracted capacity for the full contract term; what changes is the date and the price. The earlier the date, the higher the price.
First power, full contracted capacity
When the date matters most.
First power, full contracted capacity
When date and price both matter.
First power, full contracted capacity
When the price matters most.
Dates are indicative and assume a capacity commitment in Q1 2027; a later commitment moves each date. The timeline, price and terms are set out at term sheet and become binding only in the signed contract.
Your load profile, density roadmap, redundancy requirements, and target dates. We tell you plainly whether we can serve it - and when. If grid power is still the right call for your situation, we say so.
A formal response on available MW by timeline, at a defined Point of Delivery. Request availability →
Capacity reserved under contract terms written for procurement, lender, and investor diligence: defined outage classifications, remedies, revenue-grade metering, and milestone-backed credit support.
Financing closes, equipment is ordered and the clock starts. From NTP, schedule is driven by the timeline you chose, permitting, and site-specific scope.
Generation installed and commissioned for first power in Q1 2028, Q1 2030 or late 2031, as you chose; segmented MV distribution; A/B delivery at the POD; UPS-backed controls and black-start capability. Executed by a team with a 10+ GW track record.
Load comes online under a contract-backed SLA - not marketing uptime. Capacity scales with your load.
The scoping conversation moves fastest when you bring three things: an anticipated load range (even rough), a density roadmap (air-cooled today, liquid-cooled later is a common answer), and the date your load must be live. Site preferences help but are not required - we evaluate sites against your requirements, not the other way around.
Delivery slots are finite and reserved in sequence. The earliest dates assume a capacity commitment in Q1 2027; the same conversation a year later is a conversation about later dates. That is not a sales device: it is how equipment queues and project-financed generation work.
Dedicated Private Grid capacity for data centers, industrial facilities, and defense installations.